GN America company drilling waste management system introduction

Throughout the drilling mud system main equipment has the following composition: drug cans, ZS83 x 108-2 linear vibrating screen, QJ250 x 10 x 2/100 mud cleaner all-in-one, LW450 x 842 n centrifuges, JBQ5.5 kW mixer, JBQ7.5 kW mixer, SB6 x5 sand pump, NJQ50-3 mud gun, SLH150-45 jet slurry device, etc. USA drilling mud System  design features of several important processes, to grading of drilling mud, in accordance with the requirements of drilling technology through the overflow groove mud circulation. Can also be used for mud aggravating, mixed, mixing and filtering. Clear water pipeline in the clear water pipe connection can provide water for the mud circulating system; Drugs can provide the corresponding chemical ingredients;

The drilling fluid in the borehole when  sand pump to the lower screen the first level filter to remove the large size solid particles, then into the sedimentation tank below. after desilter below the upper deck of the vibrating screen mesh third grade filter. After after three-stage filtration purification of liquid is clean, can through the sand pump or overflow to other sedimentation pool or storage container in order to continue to use. In addition to the mud cleaning equipment, a group of mud mixed cell installed in the side of the tank. It is in the process of purification, add the necessary drilling mud materials control mud weight.

pl2

cuttings dryer  may be the second stage associated with splitting up within drilling liquids blood circulation program with regard to drilling rig. It’s a totally mechanised gear, don’t contain any kind of electrical or even hydraulic generate.

The most typical desander made by GN solids manage consists of two desander cone, 1 group, solids release trough. Desander could be put together through various qty hydrocyclones, at the. grams. 1pc cone along with 500gpm digesting price, 2pcs cones along with 1000gallons/min digesting price, 3pcs cones along with 1500gpm procedure price.

Intro associated with drilling waste management perform

In the process of drilling  waste  management  there are a lot of centrifuge can realize the solid-liquid separation, but because of their different characteristics. Treatment effect is also different. Drilling waste is drilling sewage, drilling fluid, drilling mud, drilling cuttings and the mixture of oil, is a fairly stable colloidal suspension system, contain clay, compound materials, all kinds of chemical treatment agent, sewage, oil, and drilling cuttings, such as high viscosity, high corrosion resistance, high oil content, high polluting and processing difficulty is big, cost is high, in the waste disposal, choose the suitable centrifuge is very important.

The actual drilling waste management can be used within isolating suspension along with strong stage focus becoming 270% as well as fluid stage viscosity 0. 01Pa . Utes as well as that contains strong stage granule associated with particle size, within isolating the actual suspension associated with amorphous materials hard with regard to reviving blocking fabric as well as associated with large alter within strong stage focus. And also the centrifuge can also be utilized in the number having to individual strong as well as fluid material with regard to

The actual methane is within the near-liquid condition, coating the interior associated with skin pores inside the fossil fuel (called the actual matrix). The actual open up cracks within the fossil fuel (called the actual cleats) may also include free of charge gasoline or even could be soaked along with drinking water. In contrast to a lot gas through traditional reservoirs, coalbed methane consists of hardly any weightier hydrocarbons for example lp or even butane, with no gas condensate. This frequently consists of up to and including couple of % co2. A few fossil fuel seams, for example individuals using regions of the actual Illawarra Fossil fuel Steps within NSW, Sydney, include small methane, using the prevalent fossil fuel seam gasoline becoming co2.

 drilling waste management   with regard to CSM usually just select shale shaker, desander as well as desilter with regard to 3 stage cleansing. However the recycled dirt denseness may rises or more since the good solids cant individual away through desilter to ensure that the centrifuge may needed or even depart the actual dirt as well as combining brand new dirt once again.

GN Solids Manage is really a proffessional produce with regard to drilling waste management  such as drilling waste management. Make sure you e mail us readily., chemical substance business, meals, pharmacy as well as environment safety, and so on., in a position to complete dehydration associated with strong stage, fluid making clear, splitting up associated with fluid in order to fluid in order to strong, andgranularity grading, and so on.

drilling waste management-5

GN Solids Manage is really a proffessional produce with regard to drilling waste management  such as drilling waste management. Make sure you  contact  us readily.

The desander of GN Solids control available

Submitted through Aircraft Shelter,GN Solids Manage may be the very first API licensed Solids Manage Tools producer within The far east. we are able to style as well as desander  the entire Solids Manage Program with regard to various dimension drilling rig. Lately GN includes a XJ550 HEWLETT PACKARD Workover Rig Solids Manage Program available. This technique might deal with the actual drilling dirt step-by-step, at the same time take away the cut-in gasoline, blend as well as agrivate the actual drilling dirt. This technique includes dirt container, working swimming pool, desander & vacuum cleaner degasser two phase solids manage gear; dirt agitating program, dirt combining program, thoroughly clean drinking water provide tube, dirt weapon collection, electric manage program, illumination program and so on.

Previously 5 many years, GN offers set up more than thirty the Dirt Techniques to suit the requirements associated with it’s clients Worldwide. Along with Simple Rig Upward as well as Rig Lower, Dirt Combining Abilities, Degassing, Solids Manage Gear, Little Feet Printing as well as Decreased Transport price, GN Solids Manage techniques tend to be developing quickly within recognition. To learn more of the XJ550 HEWLETT PACKARD Workover Rig Solids Manage Program, Make sure you really feel liberated to connection with GN Solids Manage.if you want to  know more information about us  visit here :

desander-1

http://www.gnsolidsamerica.com/desander.html

Desander Desilter assembly- mud system Solution

Desander Desilter set up, mud system ,drilling mud system .dirt cleanerPosted through Sophia Zhao. During rig drilling as well as HARD DISK DRIVE drilling, dirt program is among the operating components Operating process associated with dirt solution

The dirt solution is actually a mix of desanders and/or desilters installed on the shaker having a good nylon uppers display. Dirt is actually given towards the inlet from the hydrocyclone (desander and/or desilter) to split up contaminants and also the underflow goes by towards the good display nylon uppers exactly where within contaminants bigger than barite tend to be thrown away as well as disposed of. In many drilling procedures, the dirt solution is actually set up within it’s dirt techniques. It is almost always positioned in the dirt container within the exact same area just like the actual desilters.Various titles through various produce with regard to dirt solution.With regard to dirt solution, There are plenty associated with titles directed at the actual mixture of hydrocyclone as well as shale shaker. Within NOVEMBER, it’s known as dirt conditioner; circulation collection solution; Mi swaco, dirt solution; within The far east, GN Solids Manage, additionally called this dirt solution.

Title with regard to dirt solution as well as operating fuctuions  drilling mud system  can also be known as Desander as well as Desilter set up, that is the actual mixture of desander, desilter as well as a good underflow display. Specifically, dirt cleansers includes a two-stage splitting up procedure utilizing a mix of hydrocyclones installed on the shale shaker to use like a solitary device. Made to manage the whole moving quantity, Drilling cuttings cleansers work upon each weighted as well as unweighted drilling-fluid techniques within getting rid of as well as drying out solids whilst keeping the actual costly fluid. The actual hydrocyclones(desanders as well as desilters) help to make the main splitting up along with underflow aimed on to the actual shakers vibrating display. Utilized properly, the actual drilling dirt solution reduce each drilling-fluid as well as fingertips expenses.

drilling mud system-1

The above mentioned image is really a desilter along with four qty associated with 4 cyclone employed by 200GPM dirt program within HARD DISK DRIVE. It s a little dirt solution..review click here :  http://www.ehow.com/facts_7964827_mud-system-works-oil-rig.html

Mud Agitator for Weddings- Gives You a Decent Look

Mud Agitator for Weddings- Gives You a Decent Look

 

To achieve optimum performance and reliability from your degasser, the services and utilities described in the following paragraphs must be available at the installation site.

Mud system The customer must provide a compartmentalized mud-settling system.

Mud Agitator A customer-supplied centrifugal pump is required for operating the eductor. The pump must provide 75 feet of head at the eductor inlet, which must be located no farther than 25 feet from the degasser.

For electrical service requirements, refer to the voltage label above the electrical junction box. Also consult the data plate on the vacuum pump motor housing to verify power requirements. Refer to Section 11 – Reference Drawings for the wiring schematic that applies to your degasser. Electric service will also be required for the customer-supplied centrifugal pump drive motor.

The vacuum pump has a 1-1/2” NPT fitting on its outlet manifold. This fitting is provided for carrying the extracted gas away from the degasser. The customer must connect a suitable line to carry the gas to a safe distance from the equipment.

Drilling Waste Management is gnsolidsamerica company’s patented products

To make sure bearing operated well, we must use LGHP2 grade high temperature lubrication grease. Before adding new lubrication grease we should clean the input hole.Commonly, bearing will have natural temperature increase by 1-2 days just after lubricating or second lubrication.To avoid dust fall into oil input hole, or wear bearing, usually we’ll use oil cup to cover oil hole.

If we operate the drilling waste management after long time off status, we need to inspect motor rotary unit on insulation. Use 500V Ω gauge, get resistance is not larger than 0.5MSZ, we can run the Desilter.

Notice: If the motor doesn’t run at all, we must shut off the power immediately to avoid motor broken.After starting motor, to inspect, whether this is any problem. If there is any break off or uncommon noise. If two motors are not running in-phase we need to stop the motors and get rid of problems then turn it on again for operation.. When mud system is under cold status, should not be started 5 times continuously; when motor is turned off under hot status, the restart can not be over 3 times continuously.

Gnsolidsamerica is the author of the article on mud system and  Desilter, find more information about drilling waste management,you can directly visit http://www.gnsolidsamerica.com/drilling-waste-cuttings-management.html

Desilter introduce come from gnsolidsamerica and wiki.org

Flush the desilter drilling equipment according to item 4.2.4 when start-up it after a long time idle.
Drum must begin running when main driving motor’s speed reaches 80~90% of its full speed, otherwise stop the motor immediately. Check if the oil level of the coupler correct, or any obstruction exists in the drum.
Service oil temperature can’t exceed 90°C when the coupler run continuously.
The melting temperature of the meltable plug in the coupler is 125°C. If the oil temperature exceed 125°C because of overload, fusible alloy in the meltable plug is melt , the oil in it spays out , at this time, Desilter must be stopped at once. Supply oil as above mentioned. Replace the meltable plug with another one of the same specification. Caution: Don’t replace the meltable plug with solid bolt.
After using, flush the drum and inner cavity . Caution: When you flush the underflow nozzle of drum’s small end, never strentch your fingers into the hole because screw propeller may be still running even though the drum has stopped rotating, fingers may be cut off!!
Mud filling speed should below 40m3/h, otherwise, it is easy to cause overload in charged mud and then make the shear pin to be cut or clutch slips. In non-charged mud, liquid phase may flow away from the underflow opening, cause waste.
Separating effect will decrease when mud viscosity at inlet opening exceed 38 seconds. Fill amount of water in to dilute and decrease funnel viscosity below 35 seconds.
Operation personnel should check and see bearing holder’s temperature on two ends, differential temperature and sand discharging condition. If discharged sand is thin slurry which can flow continuously and automatically, it means that the separating effect is the best, and with light load, this is very important for prolonging the life of the centrifuge. If discharged sand is lump and come out discontinuously, at the same time, it looks very dry. It means that mud with too much sand and centrifuge’s load is too heavy, adequate split-flow should be done. Otherwise, it will lead to main motor’s stoppage because of overload or main bearing and differential’s temperature rising. In another word, main bearing or differential’s temperature rising(main bearing’s temperature exceed 70°C, differential’s exceed 50°C) indicate that mud has too much sand and split-flow should be done,Drain off remained liquid in the drum when stopping the centrifuge in winter and rescrew the bolt after the liquid is drain off(the bolt is at the big end of drum).

Mud Agitator adjustment refer to fig V

Mud Agitator adjustment
Mud Agitator adjustment refer to fig V. There is mainly bracket, pedestal, elevation whirl worm, elevation nuts, etc. When we make adjustment, handle wheel rotary by clockwise, shaker deck angle will be larger; handle wheel rotary by anti clockwise shaker deck angle will be less.
Mud Agitator output angle adjustment can be operated under running and off. When finish the shaker deliver it, the shaker deck is 0°. When user operate shaker, according to drilling mud property and flow rate on job site, and adopts same screen, the angle is higher, the treating performance will be better while treating capacity will be higher. When drilling fluid is leaking on shaker deck, increase deck angle can get rid of fluid flow away
Angle range: -2 ~ +8°, rated angle is 0~ +5°

Fig V. mud agitator manufacturer Clean dust on shell regularly,Before operating, must check the bolts to confirm whether there is loose or not. Otherwise, we must screw bolts tight before running shaker,Inspect the cable, whether there is wear, hold down, crushing, etc.
the vibration motor should be under good lubrication during operation:
Motors before fixed on shaker, the bearing is filled with SKF specific lubricate grease, the temperature range is -40 ~ 200℃
During running, every 2000 working hours user should makeup LGHP2 lubricate grease once. Every bearing can not be filled over 25.8g
During 2000 hours, if any bearing daily temperature increase (temperature increase means motor shell actual one deduct environment temperature, every half one month test on bearing temperature increase is requested) 10° than common situation. This means the lubrication isn’t sufficient. At this time, the lubrication schedule and lubrication grease make up quantity should be decreased properly. In principle, every 2000hours, every bearing lubrication grease makeup should be less than 25.8g. Such as, lubrication period will be deducted half of usual quantity (1000 hours) while lubrication grease make up should be less than 12.9g. Usually, bearing daily temperature increase every 10°, lubrication period and make up quantity should be decreased once
To make sure bearing operated well, we must use LGHP2 grade high temperature lubrication grease. Before adding new lubrication grease we should clean the input hole.
Commonly, bearing will have natural temperature increase by 1-2℃ just after lubricating or second lubrication.To avoid dust fall into oil input hole, or wear bearing, usually we’ll use oil cup to close oil hole.
Resource Box :
The author of the article recommends Mud Agitator for all of the factory,pls visit us to know more.

Our company launched Desander machine is worth buying

Before startup, first to open the ball valve on the vacuum pump water supply pipeline (alternatively could removed the vacuum pump water supply pipeline to use hose for water supply) and then unscrew the screw plug on the Mud Cleaner to fill water until the water over flow outlet and spin on the screw plug.

Finally, rotate the coupling by hand or pipe wrenches few rounds to confirm that the Solids Control is not jammed or other damage then start.

Before the start, you should first figure out the direction of rotation of the Desander, vacuum pump and main motor belt guard are marked the direction by arrow, should be the same direction with the arrow, strictly prohibited of reverse run.

Gnsolidsamerica.com is the owner of the article on desander desilter and  Desander, pls click here to know more info.pls visit us http://www.gnsolidsamerica.com