Monthly Archives: April 2014

The desander of GN Solids control available

Submitted through Aircraft Shelter,GN Solids Manage may be the very first API licensed Solids Manage Tools producer within The far east. we are able to style as well as desander  the entire Solids Manage Program with regard to various dimension drilling rig. Lately GN includes a XJ550 HEWLETT PACKARD Workover Rig Solids Manage Program available. This technique might deal with the actual drilling dirt step-by-step, at the same time take away the cut-in gasoline, blend as well as agrivate the actual drilling dirt. This technique includes dirt container, working swimming pool, desander & vacuum cleaner degasser two phase solids manage gear; dirt agitating program, dirt combining program, thoroughly clean drinking water provide tube, dirt weapon collection, electric manage program, illumination program and so on.

Previously 5 many years, GN offers set up more than thirty the Dirt Techniques to suit the requirements associated with it’s clients Worldwide. Along with Simple Rig Upward as well as Rig Lower, Dirt Combining Abilities, Degassing, Solids Manage Gear, Little Feet Printing as well as Decreased Transport price, GN Solids Manage techniques tend to be developing quickly within recognition. To learn more of the XJ550 HEWLETT PACKARD Workover Rig Solids Manage Program, Make sure you really feel liberated to connection with GN Solids Manage.if you want to  know more information about us  visit here :

desander-1

http://www.gnsolidsamerica.com/desander.html

Desander Desilter assembly- mud system Solution

Desander Desilter set up, mud system ,drilling mud system .dirt cleanerPosted through Sophia Zhao. During rig drilling as well as HARD DISK DRIVE drilling, dirt program is among the operating components Operating process associated with dirt solution

The dirt solution is actually a mix of desanders and/or desilters installed on the shaker having a good nylon uppers display. Dirt is actually given towards the inlet from the hydrocyclone (desander and/or desilter) to split up contaminants and also the underflow goes by towards the good display nylon uppers exactly where within contaminants bigger than barite tend to be thrown away as well as disposed of. In many drilling procedures, the dirt solution is actually set up within it’s dirt techniques. It is almost always positioned in the dirt container within the exact same area just like the actual desilters.Various titles through various produce with regard to dirt solution.With regard to dirt solution, There are plenty associated with titles directed at the actual mixture of hydrocyclone as well as shale shaker. Within NOVEMBER, it’s known as dirt conditioner; circulation collection solution; Mi swaco, dirt solution; within The far east, GN Solids Manage, additionally called this dirt solution.

Title with regard to dirt solution as well as operating fuctuions  drilling mud system  can also be known as Desander as well as Desilter set up, that is the actual mixture of desander, desilter as well as a good underflow display. Specifically, dirt cleansers includes a two-stage splitting up procedure utilizing a mix of hydrocyclones installed on the shale shaker to use like a solitary device. Made to manage the whole moving quantity, Drilling cuttings cleansers work upon each weighted as well as unweighted drilling-fluid techniques within getting rid of as well as drying out solids whilst keeping the actual costly fluid. The actual hydrocyclones(desanders as well as desilters) help to make the main splitting up along with underflow aimed on to the actual shakers vibrating display. Utilized properly, the actual drilling dirt solution reduce each drilling-fluid as well as fingertips expenses.

drilling mud system-1

The above mentioned image is really a desilter along with four qty associated with 4 cyclone employed by 200GPM dirt program within HARD DISK DRIVE. It s a little dirt solution..review click here :  http://www.ehow.com/facts_7964827_mud-system-works-oil-rig.html

Mud Agitator for Weddings- Gives You a Decent Look

Mud Agitator for Weddings- Gives You a Decent Look

 

To achieve optimum performance and reliability from your degasser, the services and utilities described in the following paragraphs must be available at the installation site.

Mud system The customer must provide a compartmentalized mud-settling system.

Mud Agitator A customer-supplied centrifugal pump is required for operating the eductor. The pump must provide 75 feet of head at the eductor inlet, which must be located no farther than 25 feet from the degasser.

For electrical service requirements, refer to the voltage label above the electrical junction box. Also consult the data plate on the vacuum pump motor housing to verify power requirements. Refer to Section 11 – Reference Drawings for the wiring schematic that applies to your degasser. Electric service will also be required for the customer-supplied centrifugal pump drive motor.

The vacuum pump has a 1-1/2” NPT fitting on its outlet manifold. This fitting is provided for carrying the extracted gas away from the degasser. The customer must connect a suitable line to carry the gas to a safe distance from the equipment.

Drilling Waste Management is gnsolidsamerica company’s patented products

To make sure bearing operated well, we must use LGHP2 grade high temperature lubrication grease. Before adding new lubrication grease we should clean the input hole.Commonly, bearing will have natural temperature increase by 1-2 days just after lubricating or second lubrication.To avoid dust fall into oil input hole, or wear bearing, usually we’ll use oil cup to cover oil hole.

If we operate the drilling waste management after long time off status, we need to inspect motor rotary unit on insulation. Use 500V Ω gauge, get resistance is not larger than 0.5MSZ, we can run the Desilter.

Notice: If the motor doesn’t run at all, we must shut off the power immediately to avoid motor broken.After starting motor, to inspect, whether this is any problem. If there is any break off or uncommon noise. If two motors are not running in-phase we need to stop the motors and get rid of problems then turn it on again for operation.. When mud system is under cold status, should not be started 5 times continuously; when motor is turned off under hot status, the restart can not be over 3 times continuously.

Gnsolidsamerica is the author of the article on mud system and  Desilter, find more information about drilling waste management,you can directly visit http://www.gnsolidsamerica.com/drilling-waste-cuttings-management.html

Desilter introduce come from gnsolidsamerica and wiki.org

Flush the desilter drilling equipment according to item 4.2.4 when start-up it after a long time idle.
Drum must begin running when main driving motor’s speed reaches 80~90% of its full speed, otherwise stop the motor immediately. Check if the oil level of the coupler correct, or any obstruction exists in the drum.
Service oil temperature can’t exceed 90°C when the coupler run continuously.
The melting temperature of the meltable plug in the coupler is 125°C. If the oil temperature exceed 125°C because of overload, fusible alloy in the meltable plug is melt , the oil in it spays out , at this time, Desilter must be stopped at once. Supply oil as above mentioned. Replace the meltable plug with another one of the same specification. Caution: Don’t replace the meltable plug with solid bolt.
After using, flush the drum and inner cavity . Caution: When you flush the underflow nozzle of drum’s small end, never strentch your fingers into the hole because screw propeller may be still running even though the drum has stopped rotating, fingers may be cut off!!
Mud filling speed should below 40m3/h, otherwise, it is easy to cause overload in charged mud and then make the shear pin to be cut or clutch slips. In non-charged mud, liquid phase may flow away from the underflow opening, cause waste.
Separating effect will decrease when mud viscosity at inlet opening exceed 38 seconds. Fill amount of water in to dilute and decrease funnel viscosity below 35 seconds.
Operation personnel should check and see bearing holder’s temperature on two ends, differential temperature and sand discharging condition. If discharged sand is thin slurry which can flow continuously and automatically, it means that the separating effect is the best, and with light load, this is very important for prolonging the life of the centrifuge. If discharged sand is lump and come out discontinuously, at the same time, it looks very dry. It means that mud with too much sand and centrifuge’s load is too heavy, adequate split-flow should be done. Otherwise, it will lead to main motor’s stoppage because of overload or main bearing and differential’s temperature rising. In another word, main bearing or differential’s temperature rising(main bearing’s temperature exceed 70°C, differential’s exceed 50°C) indicate that mud has too much sand and split-flow should be done,Drain off remained liquid in the drum when stopping the centrifuge in winter and rescrew the bolt after the liquid is drain off(the bolt is at the big end of drum).