Lately, GN’s drying shale shaker system has finished its commission. As GN stay with quality and repair, best of luck is just looked over before delivery from GN factory, and complex mud system GN provides commissioning service by dispatching engineers towards the working site.
As proven within the below introduction, the mud cleaner is installed between 2 models of shale shaker. It’s not general layout, once we have spoken that for any solids control systemor perhaps a mud system, mud cleaner (normally the alternative of a desnader and desilter) within the next stage to process drilling mud after shale shaker. Even though it is specifically created by GN engineer using the thought on narrow space within the working site, and fully thinking around the pipe connection. GN engineer strongly and thoroughly modified the overall design by finding the mud cleaner between 2 models of shale shakers. The drilling mud pumped out of the well is going to be given individually towards the 2 shale shakes for treatment, and they pumped in to the mud cleaner for more process.
Regarding towards the shale shaker, to safeguard it from damage, its deck is locked throughout transportation. Prior to the trial running, the operator need fixed the shale shaker on the top from the mud tank and unlock when. GN shale shaker‘s vibration motor originates from famous label Italia OLI or Martin with explosion -proof consideration for performance and safety. GN is first API licensed solids Control Company in China. Near the above two features, Simple structure is among the options that come with the GN’s shale shaker, the consumer can certainly master how you can operate it and perform the commissioning themselves. Concerning the control panel, GN provides electric diagram, the operator can begin and switch from the shale shaker without an excessive amount of electrical understanding.